Jiangsu XST Machinery Technology Co., Ltd Message
News

Location: Home > About Us > News > News

News
Annealing principle of wire drawing machine

Source:本站 | Release Date: 2022-09-14 13:13:20 | Views:202

Summary:

1. Inspection before starting1. Whether the wire drawing machine, quenching equipment and wire take-up machine are intact.2. Is the power supply, gas circuit, grease and ethanol complete?3. The manufacturing site should be cleaned without dirt, water…

1. Inspection before starting

1. Whether the wire drawing machine, quenching equipment and wire take-up machine are intact.

2. Is the power supply, gas circuit, grease and ethanol complete?

3. The manufacturing site should be cleaned without dirt, water or oil stains.

4. Special tools, measuring instruments, and mold shells are complete.

5. Prepare mold shells in advance according to the size specified in the safety operation regulations.

6. After passing through the die, the copper wire bypasses each metal wire drawing drum and passes through the quenching section to the wire take-up machine.

2. Start

1. Calibration of the potentiometer knob of the drawing machine.

2. Cover the main power switch rocker and press the power button.

3. Press the operation panel, set the data information, open the reset switch, set the cable diameter, and set the speed to set the main parameters.

4. Press the controller reset switch to restore the standby state.

5. Press the power button and add a small amount of ethanol to the vacuum solenoid valve.

6. Press the controller to operate, the stop button can be turned on, and additionally turn the wire drawing machine knob to synchronize with the wire take-up machine, and gradually achieve the set speed.

3. Drying temperature

After the startup and everything is running normally, adjust the drying temperature knob, and the drying current does not need to be very large.

A large amount of current can easily cause secondary air oxidation. The filter device must filter the water cleanly, otherwise it will cause air oxidation points. The same cable diameter does not need to adjust the drying temperature button when starting the machine twice.

4. All normal parking and emergency shutdown

1. Press the controller operation, stop button

2. Press the control button

3. Wire drawing machine speed knob calibration

4. Turn off the controller and calibrate the switching power supply

5. Press the emergency stop switch for emergency shutdown

Five, should be frequently asked questions

1. The construction line should not be crossed, chaotic, or bent, otherwise it will be disconnected.

2. The cooling circulating water of the stainless steel water tank should be kept clean and the temperature should not exceed 40 degrees.

3. The controller is a smart component, and it is not necessary to use too much force in actual operation.

4. The actual operating staff should read the manual carefully before starting the machine.

6. After completion, clear the site, sort out special tools, and leave after power failure.

Previous: none

Related News
Jiangsu XST Machinery Technology Co., Ltd
Located on the bank of Lake Gehu, relying on the superior geographical environment of Wujin District, Changzhou city, the company has run well since 1992. We are very professional in the production of plastic extrusion machinery.
Products

Artificial grass machinery

Carpet machinery

Round monofilament extrusion machine

Flat yarn/film extrusion machine

Warp knitting machine

Raw materials

Contact

No.58 Nanzhong East Road, Heqiao, Yixing, Wuxi, Jiangsu, China

+86 13901505180

http://www.xst.net

xst@xst.net / Benny@xst.net

Copyright © 2021-2023 Jiangsu XST Machinery Technology Co., Ltd 苏ICP备17043475号-2 All Rights Reserved
Top
Copyright 2021-2023 XST Machinery Technology